During the fitting of pre-assembled doors, a handling device bears the main load
The cockpit is prepared for installation on a separate assembly belt
Boxster S in the "seat assembly" production phase
All vehicles are checked for leaks in a rain test
All vehicles are checked for leaks in a rain test
Before the cars leave production, the paintwork is checked again in the light tunnel
Welding of front end
The seat carriers are connected to the vehicle floor by spot-welding
Side section production of the 911 Turbo
Before the floorpan and the side sections are welded together, they are connected loosely in the clip station
Welding of the Boxster floorpan
Before welding, the clamping frame holds the side sections and the floorpan in position
Side sections and floorpan of the Boxster are welded
After the welding of the floorpan with the side sections, laser sensors ensure that the correct dimensions are observed
MAG welding on the B-pillar of the Boxster
Final welding work on the body of the 911 Turbo
A robot welds fastening elements (bolts) required e.g. for wiring harnesses
MAG welding of the rear cross member in the 911 Carrera Cabriolet
Testing the windscreen opening with a gauge
In a 3D measuring station, it is checked whether the prescribed body dimensions have been observed